Past Projects

Based in Queensland’s Surat Basin, Western Downs Civil (WDC) is a diversified civil infrastructure company with project delivery capability across a range of industry sectors.

Project: APLNG Upstream

Location Condabri/Orana Fields
Client Origin Energy Operations
Category Civil Earthworks
Job Description

Installation of gravel access tracks where required including all associated drainage and rehabilitation.

View Services

 

  • Expert personnel to inspect jobsite and help plan works and trouble shoot any linked complications alongside the client
    • project managers and supervisors with years of on the ground experience and knowledge
    • good communication expertise
  • All required safety documentation provided
    • Safety Health and Environment work method statements
    • Standard Operating Procedures
    • Plant risk assessments
    • Start card/Take 5
  • Plant and machines supplied
    • meet mine specifications
    • IVMS
    • well maintained
    • laser and GPS fitted where required
    • graders/excavators/truck and dogs/side tippers/water trucks/rollers
  • Trained and competent operators
    • willingness to not compromise safety
    • ability to work unsupervised
    • final trim ability
    • multi-skilled
    • fit for work
  • Live service permit management
    • trained permit holders/workers
    • understanding of importance and safety required when working around live services
  • Works carried out to required specifications efficiently
    • boxed out to correct depth
    • compacted in correct layers
    • trimmed to design
    • all proof rolls and FICs’ completed
  • Environmental reinstated and installed following design
    • any water ways crossed re-established to original
    • controls including drainage lines, whoa boys and silt fencing, established in areas where erosion may occur
    • weed management followed at all times
  • Continuing communication with client throughout entirety of job through to competition
    • follow all direction given

 

Project: APLNG Upstream

Location Condabri/Orana Fields
Client Origin Energy Operations & Construction
Category Pipeline Excavation
Job Description

Excavation of specialised bell-holes where personnel and plant must enter to perform works.

Mechanical excavation and backfill of live services including High Pressure gas lines/High Voltage power cables and Optic Fibre Telecommunication lines where the service must be either crossed or worked on while energised.

View Services

 

  • Expert personnel to inspect jobsite and help plan works and trouble shoot any linked complications alongside the client
    • project managers and supervisors with years of on the ground experience and knowledge
    • good communication expertise
  • All required safety documentation provided
    • Safety Health and Environment work method statements
    • Standard Operating Procedures
    • Plant risk assessments
    • Start card/Take 5
  • Plant and machines supplied
    • meet mine specifications
    • IVMS
    • well maintained
    • laser and GPS fitted where required
    • excavators fitted with poly buckets
  • Trained and competent operators
    • willingness to not compromise safety
    • trained and experienced in live service excavation
    • ability to work unsupervised
    • final trim ability
    • multi-skilled
    • fit for work
  • Live service permit management
    • trained permit holders/workers
    • understanding of importance and safety required when working around live services
  • Works carried out to required specifications efficiently
    • follow all directions from live excavation

 

Project: APLNG Upstream

Location Condabri and Orana Fields
Client Origin Energy Construction
Category Civil Earthworks/Fencing
Job Description

Installation and construction of property entrance including grids, gates, associated fencing (cattle rail/barbed wire/netting/spilt post/steel post) and gravel access tracks and grid ramps.

View Services

 

  • Expert personnel to inspect jobsite and help plan works and trouble shoot any linked complications alongside the client
    • project managers and supervisors with years of on the ground experience and knowledge
    • good communication expertise
  • All required safety documentation provided
    • Safety Health and Environment work method statements
    • Standard Operating Procedures
    • Plant risk assessments
    • Start card/Take 5
  • Plant and machines supplied
    • meet mine specifications
    • IVMS
    • well maintained
    • laser and GPS fitted where required
    • graders/excavators/truck and dogs/side tippers/water trucks/rollers
  • Trained and competent operators/welders/dogman
    • willingness to not compromise safety
    • ability to work unsupervised
    • final trim ability
    • multi-skilled
    • fit for work
  • Permit management
    • trained permit holders/workers
    • understanding of importance of all permit hazards and controls
  • Works carried out to required specifications efficiently
    • correct materials used
    • completed to design
  • Environmental reinstated and installed following design
    • any water ways crossed re-established to original
    • controls including drainage lines, whoa boys and silt fencing, established in areas where erosion may occur
    • weed management followed at all times
  • Continuing communication with client throughout entirety of job through to competition
    • follow all direction given

 

Project: QGC Kenya Spillway

Location Kenya Spillway
Client QGC
Category Fabrications
Job Description  Removal and replacement of existing handrails & gateways into Kenya Water Treatment Pond. 

View Services

  • Expert personnel to inspect jobsite and help plan works and trouble shoot any linked complications alongside the client
    • project managers and supervisors with years of on the ground experience and knowledge
    • good communication expertise
  • All required safety documentation provided
    • Safety Health and Environment work method statements
    • Standard Operating Procedures
    • Plant risk assessments
    • Start card/Take 5
  • Plant and machines supplied
    • meet mine specifications
    • IVMS
    • well maintained
    • laser and GPS fitted where required
    • graders/excavators/truck and dogs/side tippers/water trucks/rollers
  • Trained and competent operators/welders/dogman
    • willingness to not compromise safety
    • ability to work unsupervised
    • final trim ability
    • multi-skilled
    • fit for work
  • Permit management
    • trained permit holders/workers
    • understanding of importance of all permit hazards and controls
  • Works carried out to required specifications efficiently
    • correct materials used
    • completed to design
  • Environmental reinstated and installed following design
    • any water ways crossed re-established to original
    • controls including drainage lines, whoa boys and silt fencing, established in areas where erosion may occur
    • weed management followed at all times
  • Continuing communication with client throughout entirety of job through to competition
    • follow all direction given

 

Project: NRG Pipe Supports

Location Kenya Water Treatment Plant
Client NRG Piping
Category Civil Construction
Job Description

Construction of 66 pipe supports. Works include: Setting out of pipes, excavated piers, instillation of reinforcement steel & bolts, setting of concrete.

View Services

 

  • Expert personnel to inspect jobsite and help plan works and trouble shoot any linked complications alongside the client
    • project managers and supervisors with years of on the ground experience and knowledge
    • good communication expertise
  • All required safety documentation provided
    • Safety Health and Environment work method statements
    • Standard Operating Procedures
    • Plant risk assessments
    • Start card/Take 5
  • Plant and machines supplied
    • meet mine specifications
    • IVMS
    • well maintained
    • laser and GPS fitted where required
    • graders/excavators/truck and dogs/side tippers/water trucks/rollers
  • Trained and competent operators/welders/dogman
    • willingness to not compromise safety
    • ability to work unsupervised
    • final trim ability
    • multi-skilled
    • fit for work
  • Permit management
    • trained permit holders/workers
    • understanding of importance of all permit hazards and controls
  • Works carried out to required specifications efficiently
    • correct materials used
    • completed to design
  • Environmental reinstated and installed following design
    • any water ways crossed re-established to original
    • controls including drainage lines, whoa boys and silt fencing, established in areas where erosion may occur
    • weed management followed at all times
  • Continuing communication with client throughout entirety of job through to competition
    • follow all direction given

 

Project: TCIP

Location Condabri/Tallinga
Client CPB Contractors
Category Civil Construction
Job Description

Construction of substations to supply power to well sites 

Works include: Construction of hardstands, instillation of conduits, earthgrids, concrete foundations & fencing. 

View Services

 

  • Expert personnel to inspect jobsite and help plan works and trouble shoot any linked complications alongside the client
    • project managers and supervisors with years of on the ground experience and knowledge
    • good communication expertise
  • All required safety documentation provided
    • Safety Health and Environment work method statements
    • Standard Operating Procedures
    • Plant risk assessments
    • Start card/Take 5
  • Plant and machines supplied
    • meet mine specifications
    • IVMS
    • well maintained
    • laser and GPS fitted where required
    • graders/excavators/truck and dogs/side tippers/water trucks/rollers
  • Trained and competent operators/welders/dogman
    • willingness to not compromise safety
    • ability to work unsupervised
    • final trim ability
    • multi-skilled
    • fit for work
  • Permit management
    • trained permit holders/workers
    • understanding of importance of all permit hazards and controls
  • Works carried out to required specifications efficiently
    • correct materials used
    • completed to design
  • Environmental reinstated and installed following design
    • any water ways crossed re-established to original
    • controls including drainage lines, whoa boys and silt fencing, established in areas where erosion may occur
    • weed management followed at all times
  • Continuing communication with client throughout entirety of job through to competition
    • follow all direction given